Frequently Asked Questions

Why measure at the rack rather than the room?

Guidance is written for intake conditions.

A room average describes nothing a server experiences.

Comfortable halls still contain badly fed racks.

Only inlet sensing finds them.

The measurement point decides the value of the data.

Position before quantity, always.

How many sensors does a rack need?

Three is the common arrangement.

Low, middle and high on the front face.

One at mid height hides both extremes.

The top is where recirculated air arrives first.

The gradient shows whether containment works.

A single point cannot show a gradient.

What does measuring the outlet add?

The temperature rise across the rack.

That reveals airflow problems inlet readings miss.

A starved rack shows a large rise.

Its inlet can still look perfectly correct.

Differential data diagnoses, single points alarm.

Worth it on high density racks at least.

Wired or wireless?

Wired where cable can be run at build.

Wireless suits retrofit into a live hall.

Cable crossing containment is disruptive.

Wireless brings a battery cycle at scale.

Thousands of points means a real programme.

Somebody has to own that cycle.

Which envelope should readings be judged against?

The one the hardware vendor states.

Industry guidance gives recommended and allowable bands.

Allowable is not a target to run at.

Time spent near limits shortens equipment life.

Record excursions, not just current values.

Agree the band before setting alarms.

How accurate do they need to be?

Accurate enough to trust a small margin.

Raising supply temperature saves real energy.

That is only safe with credible measurement.

Poor accuracy forces a conservative setpoint.

Check drift and calibration interval.

Cheap sensors cost energy indirectly.

What makes a sensing programme fail?

Data arriving where nobody acts.

Alarms configured then permanently ignored.

Sensors displaced during rack work.

Positions undocumented after installation.

Record the position of every point.

Re-check placement after any hall change.